Request a quote

Foundation underpinning

We build new materials and elements into the body of the foundation and into the base. They take part of the load, compact the structure and force the foundation-soil system to work together - the deformation of the building stops.

WHY THE FOUNDATION LOSES RELIABILITY Material wear Change in hydrogeology Soil subsidence Increased loads during reconstruction
Selection of solution

What is happening to the building?

How it works ↓

How the work proceeds

Expand ↗ STEP / 04 ← WHERE WE APPLY REGULATORY FRAMEWORK Entire regulatory framework →
SIMULATOR · BUILDING SUPERSTRUCTURE

Add floors — see the settlement

The superstructure increases the load on the old foundation. Watch how the settlement increases, or move the slider yourself - and compare how the base behaves without reinforcement, after cementation of the contact and on micropiles.

SECTION · CONDITIONAL DIAGRAM · Expand ↗ BASE SUPERSTRUCTURE + FLOORS Illustrative diagram. The permissible load and settlement for your building is determined by inspection and calculation.

Is the building settling? Start with a survey.

Submit task +7 (995) 506-67-75