Request a quote ☰
SKAVO JSC · Geotechnical construction

The foundation behind your project residential buildings office buildings shopping centres hotels your project

We design and optimize the fencing of excavations, perform anchoring, soil strengthening and strengthening of foundations - from calculation to commissioning of the facility.

Discuss the project Areas of work View objects ↓ SCAN X-ray of soil What's underground? Point the lens at the design - we’ll show you the technology we use to make it. Run your finger along the cut - we’ll show you the technology we use to make it.
Ground anchors ◆ Soil nails ◆ Jet grouting ◆ DSM deep mixing ◆ Tube-à-manchette grouting ◆ Micropiles ◆ Diaphragm wall ◆ Ground anchors ◆ Soil nails ◆ Jet grouting ◆ DSM deep mixing ◆ Tube-à-manchette grouting ◆ Micropiles ◆ Diaphragm wall ◆
Objects −2 m

Buildings that stand on our foundations

Each object is a excavation, soil or foundation for which we were responsible. Open the case to see the problem, solution and result.

Showcase On the map Showcase On the map View full photo ↗ PROJECT / Open case Similar task PHOTO SOON · PHOTO SOON · · × Go to object → Before and after Before and after View full photo ↗ / ← → [BEFORE PHOTO] [AFTER PHOTO] AFTER UNTIL CASE / · × Similar task - discuss ← →
SKAVO in numbers · −3 m 1708 pcs * ground anchors 33629 m * total length of anchors 700 m * waler beam 9847 m * cementation and soil strengthening * Volumes of published portfolio objects.
Activity −5 m

Three directions. One responsibility.

We select the technology for the geology of the site and the design of the structure - and we ourselves carry out the work on the project.

01

Excavations, slopes and hillsides

Anchor and spacer systems for sheet piling, pipe and pile fencing, including “soil wall”. Ground anchors and soil nail fields.

02

Foundation underpinning

Cementation of the foundation-soil contact and micropiles for existing buildings and structures.

03

Ground improvement

Jet grouting, deep mixing (DSM) and tube-à-manchette grouting.

−12.0 m · transition to load-bearing layers Below is what holds the building up
About the company · −15 m

Full cycle — from design to the last anchor

SKAVO carries out construction and installation work in the field of geotechnical construction, as well as optimizes and designs excavation fencing.

We guarantee high quality work and compliance with all current norms and standards.

Meet the team → I

Engineering design

Calculation and optimization of the excavation fencing according to the geology of the site.

Model and calculation → II

Technology selection

Anchors, soil nails, spacers or soil strengthening - according to the task, not according to the template.

III

Installation

Own construction and installation work on site.

IV

Quality control

Work in accordance with norms and standards, documentation for the facility.

PRODUCT CHART Anchor products −20 m

Components that we install ourselves

Supply of anchor products for ground anchors and soil nails. We will select a system for the loads and conditions of your facility.

View catalog Request selection
Customers · −25 m

Trusted by leading companies

All objects → NOVATEK DONSTROY VELESSTROY PIC MOSINZHPROEKT MR GROUP FORMA STONE Details ↗
Technologies −26 m

Seven ways to retain the ground

Choose a technology - we’ll show you how it works in the ground and for what tasks we use it.

→ DIAGRAM · / 07 Expand ↗ Expand ↗ Expand ↗ Expand ↗ Expand ↗ SOIL-CEMENT ELEMENTS Expand ↗ SOIL CEMENT ELEMENTS DSM Expand ↗ Select for my object More about the technology →
Site briefing · −28 m

Tell us about your project — it takes a minute

Five short steps instead of a long questionnaire. The engineer will get everything to answer on the merits, and not call back with clarifications.

✓

What needs to be done?

●

What object?

City or site address

Specifications

m 0 −10 −20 −30 M If you don’t know exactly, give it an approximate value and we’ll clarify it according to the project. M When does work start?

Documents on the object

STEP CAN BE SKIPPED Drag files or click to select Engineering geology, technical specifications, project · PDF, DWG, DOCX, XLSX ×

How to contact you?

Full name * Phone * Convenient way of communication Comment (optional) By clicking “Submit Request”, I give consent to the processing of personal data in accordance with Federal Law No. 152-FZ.

Confirm your consent to the processing of personal data.

ENQUIRY The foundation has been laid. 01 · NOW The engineer studies the problem and the attached documents. 02 · WITHIN [N] H We will contact you: . 03 · NEXT We will offer a technical solution and a commercial proposal. New request ← Back STEP OF 5

Projects

  • National Center "Russia"

    Moscow, Krasnopresnenskaya embankment, 14. Ground anchors: 219 pcs. · 6,800 m

  • Residential complex “Nachalo”

    Moscow, st. Sergeya Makeeva, 7. Ground anchors: 769 pcs. · 10,407 m. Waler beam: 700 m

  • Infrastructure of food and construction clusters

    village Shchapovskoe, Moscow. Ground anchors: 78 pcs. · 1,380 m. Engineering and road infrastructure of the food and construction clusters in the settlement of Shchapovskoye (New Moscow): two water intake units with a looped water supply network, a sewage pumping station and a treatment facility with a sewer line, local treatment facilities with a supply collector, construction and reconstruction of sections of the road network.

  • Residential complex "Shitizen" - MFZHK with underground parking (UB 8b)

    Moscow, st. Tushinskaya, vl. 24. Ground anchors: 642 pcs. · 15,042 m. Cementation of soils at the base of the BPS: 6,018 m. Jet grouting: 3 333 m

  • Office building

    Moscow, st. Presnensky Val, s/u 27/5. Cementation of soils at the base of the BPS: 496 m