Ground anchors

Anchoring the walls of excavations, slopes and hillsides: design, installation and testing of anchor systems with strand and bar tendons. The anchor transfers the pulling force from the fence - “diaphragm wall”, sheet piling, piles - to a stable mass outside the zone of possible collapse.

View interactive diagram →
01

Anatomy of a ground anchor

Head
base plate with nut or wedge clamp on wall or trim beam
Tendon
strand (ropes) or rod (TVSh)
Free length
area in the zone of possible collapse, not fixed in the ground
Embedding zone
area behind the collapse zone, secured with cement mortar
02

Temporary and permanent anchors

  • — Temporary - for the construction period, usually up to 2 years; traction can be removed
  • — Permanent - for the entire life of the structure, made of corrosion-resistant materials
03

Strand and bar tendons

Stranded
1–9 prestressing strands, breaking force up to 2331 kN; temporary AGP-V, retrievable AGP-VI, permanent AGP-P
Rod TVSh
tubular screw rod 30–105 mm, load up to 2650 kN, sections with couplings
04

Benefits

  • — There are no spacers inside the excavation - the space is free for work
  • — High load-bearing capacity
  • — Efficiency in deep excavations
  • — Cost-effective for complex facilities
  • — High pace: installation in tiers following excavation
05

How we work

  1. 01 Design of an anchor system for fencing and site geology
  2. 02 Drilling wells, installing rods, injecting the sealing zone
  3. 03 Installation of the waler beam, tensioning and blocking of anchors
  4. 04 Anchor testing and as-built documentation
06

Standards and regulations

  • — SP 45.13330 “Earth structures, foundations and foundations”
  • — SP 22.13330 “Foundations of buildings and structures”